Project plan - SchemeStation


Document formatted by vherva at Fri Apr 24 11:23:50 1998 on the host schemestation. This document is produced by the SchemeStation project during the Tik-76.115 course.

  1. Introduction
    1. General description
    2. The Aim of The Project
      1. A Brief Description of the SCHEMESTATION System
      2. The SCHEMESTATION Implementation In This Project
    3. The Members of the Project
      1. The Client
      2. Project supervisor
      3. The group
      4. Project manager
      5. Process manager
      6. Testing manager
      7. Documentation manager
    4. The Rights to the Result of This Project
  2. Project phases
    1. Project design (16.9. - 13.10.)
      1. Tasks
      2. Documentation
    2. Specification (14.10. - 3.11.)
      1. Tasks
      2. Documents
    3. Implementation design (4.11. - 8.12.)
      1. Tasks
      2. Documents
    4. Prototype 1 (9.12. - 16.2.)
      1. Main tasks
      2. Documents
    5. Prototype 2 (17.2. - 23.3.)
      1. Main tasks
      2. Documents
    6. Handover (24.3. - 24.4.)
      1. Main tasks
      2. Documents
    7. Post-project activity
  3. Resource allocation and schedule
    1. The Project
      1. Using the resources
    2. Using the Resources in Each Phase
      1. Project Planning
      2. Specification
      3. Implementation design
      4. Prototype 1
      5. Prototype 2
      6. Delivery
    3. Time allocation for each task
      1. Pre-project activities
      2. Virtual SCHEMESTATION
      3. Virtual SCHEMESTATION Network
      4. Virtual SCHEMESTATION terminal
      5. Scheme environment support
      6. Scheme environment
      7. Default actors
      8. Demo application
      9. Project reports & tracking
      10. Summary
    4. Figure of the Time Allocation
    5. Costs
  4. Working methods and task allocation
    1. Tools and hardware
    2. Documentation tools
    3. Working methods
    4. Controlling the risks
    5. The severity and probability of the risks.
    6. Task allocation and the roles of the members
      1. Roles
      2. Task allocation
    7. References
  5. Management plan
    1. Observing the state of the project
    2. Schedule
      1. Meetings
      2. Course scheduled surveys along with the client and the supervisor
      3. Lectures

© SchemeStation project 1997-1998 [Back to the document index]